Category Archives: Roofing

Estero Florida Tile Roof Replacement, Gutter Install, and Exterior Paint

Our office was recently contacted by a homeowner in Estero Florida with a roof leak that required a temporary repair until the roof could be replaced. Our team inspected the roof and when appropriate, replaced the residences roofing structure using Boral’s Barcelona 900 tile in their stone light brown color. Once the home received its new roof, our team also replaced the gutter system with new 6″ aluminum seamless gutters and wedges.

As the top half of the home had undergone a complete transformation, our clients felt that the exterior finish of the home was in need of work as well. Our painting division was called in to repaint the exterior of this residence using Sherwin Williams paint products. Not only has this client’s home increased its curb appeal, but they can also rest easy knowing that their home is protected for years to come with an expertly installed roofing system from First Service!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Barcelona 900
  • Color: Stone Light Brown
  • Drip Edge Color: White
  • EXTERIOR REPAINT PAINT MANUFACTURER: SHERWIN WILLIAMS PAINT PRODUCTS
  • PRIMER: LOXON MASONRY CONDITIONER
  • STUCCO SURFACES, CEILINGS: SW DURATION SATIN
  • DOORS: SW DURATION SEMI-GLOSS

Re-Roof Scope Of Work:

Provide labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide (2) year workmanship warranty on tile application.
  • Provide manufacturers warranties.

Gutter Install Scope Of Work:

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 205LF of new desert sand 6″ aluminum seamless gutters with wedges.
  • Install up to (6) downspouts, (3) small downspouts, (15lf) splash guards, (4) miters, (4lf) of kickout extensions to match the existing layout.
  • Jobsite will be cleaned of all work-related debris upon completion.

Exterior Paint Scope Of Work:

  1. TRENCH AROUND PERIMETER OF HOME 1 TO 3 INCHES.
  2. PRESSURE WASH EXTERIOR FREE OF DIRT AND FOREIGN MATERIAL
  3. APPLY ONE COAT OF MASONRY SEALER TO STUCCO SURFACES
  4. SEAL MASONRY CRACKS, IF PRESENT, WITH ELASTOMERIC PATCHING COMPOUND
  5. INSPECT CAULK AT WINDOWS AND DOORS, IF DETERIORATED REMOVE AND REPLACE AS NEEDED
  6. APPLY ONE COAT OF SW DURATION SATIN PAINT, USING BRUSH AND ROLL TECHNIQUE, TO STUCCO WALLS, CEILINGS, FASCIA, SOFFIT, BANDS & TRIM
  7. APPLY ONE COAT OF SW DURATION SEMI-GLOSS PAINT TO THE EXTERIOR SIDE OF ENTRY & GARAGE DOORS
  8. A 10-year limited labor and materials warranty will be issued by Sherwin Williams.

Bonita Springs Commercial Tile Roof Replacement & Gutter Installation

This commercial building located in Bonita Springs Florida was the unfortunate recipient of roof damage as a result of Hurricane Irma in years past. After several temporary repairs, our office was contracted to perform a thorough inspection and ultimately provide a full commercial roof replacement. Upon commencement, our roofing teams worked together to remove the existing tile roof to make way for the client’s new Boral Villa 900 tile in their Espresso Blend colorway. As our team completed the tile roof, we also installed new 6″ aluminum seamless gutters on the first story of the building to properly channel water from the roof during storms.

While this project turned out amazing, our painting division is currently standing by to provide the building a complete exterior repaint to complete the facilities transformation!

Fort Myers Residential Tile Roof Replacement

Our office had the recent pleasure of assisting a customer within the Promenade home community in Fort Myers Florida. The home had experienced roof damage as a result of Hurricane Irma and required a tile roof replacement to properly repair. Once the project was approved, our roofing division went to work removing the existing roof structure and installed Eagle’s Malibu Coca Range tile. Following completion of our customers new roof, we installed new white 6″ aluminum seamless gutters onto the first story of the home. With hurricane season quickly approaching, this customer can rest assured that their home is protected with a new roof from First Service!

Special Materials:

  • Tile Manufacturer: Eagle
  • Style (Profile): Malibu
  • Color: Cocoa Range
  • Drip Edge Color: White

Re-Roof Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal. Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application.
  • Provide manufacturers warranties.

Gutter Installation Scope Of Work:

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 90LF of new white 6″ aluminum seamless gutters on the first story.
  • Install up to (4) downspouts, (3) splash guards, (5) miters to match existing layout.
  • Jobsite will be cleaned of all work-related debris upon completion.

Tile Roof Replacement, Gutter Installation, and Exterior Repaint For Ft. Myers Home

At First Service, we are blessed with the opportunity to work with many amazing clients. This home in Fort Myers, FL is no exception. The new homeowners within the Gateway community wanted a new look for their home, and chose our company to help. Our roofing division replaced the home’s damaged roof with a new Boral tile roof using their Barcelona 900 tile in their mountain blend colorway. Additionally, our team also installed new 6″ white aluminum seamless gutters to properly divert water off of the home’s roof. Once complete with the roof and gutter system, our painting division stepped in using Sherwin Williams premium paint products and repainted the exterior of this beautiful home.

This project turned out great and our client’s new home certainly increased its curb appeal. What a beautiful home!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Barcelona 900
  • Color: Stone Mountain Blend
  • Drip Edge Color: Grey
  • EXTERIOR REPAINT PAINT MANUFACTURER: SHERWIN WILLIAMS PAINT PRODUCTS
  • PRIMER: LOXON MASONRY CONDITIONER
  • STUCCO SURFACES, CEILINGS: SW DURATION SATIN
  • DOORS: SW DURATION SEMI-GLOSS

Re-Roof Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Gutter Installation Scope Of Work:

Provide labor and material to complete the following:

  • Install new 120 LF 6″ white aluminum seamless gutters around the entire perimeter eave of the house.
  • Install “3” new white downspouts in locations approved by the homeowner.
  • Install “2” corner strip miters, and “2” outside miters.
  • Install “2” splashed guards, one on each inside corner at the base of each roof valley.

Exterior Paint Scope Of Work:

  1. TRENCH AROUND PERIMETER OF HOME 1 TO 3 INCHES.
  2. PRESSURE WASH EXTERIOR FREE OF DIRT AND FOREIGN MATERIAL
  3. APPLY ONE COAT OF MASONRY SEALER TO STUCCO SURFACES
  4. SEAL MASONRY CRACKS, IF PRESENT, WITH ELASTOMERIC PATCHING COMPOUND
  5. INSPECT CAULK AT WINDOWS AND DOORS, IF DETERIORATED REMOVE AND REPLACE AS NEEDED
  6. APPLY ONE COAT OF SW DURATION SATIN PAINT, USING BRUSH AND ROLL TECHNIQUE, TO STUCCO WALLS, CEILINGS, FASCIA, SOFFIT, BANDS & TRIM
  7. APPLY ONE COAT OF SW DURATION SEMI-GLOSS PAINT TO THE EXTERIOR SIDE OF ENTRY & GARAGE DOORS

Recently Completed Tile Roof Replacement Within The Sandoval Home Community

Our roofing team recently had the pleasure of working within the Sandoval community in Cape Coral Florida. The roof on our customer’s two-story home had been damaged during Hurricane Irma and required a new tile roof as a result. Once contracted, our roofing division went to work removing the existing roofing structure. We installed Boral’s split slate tile in their coconut white antique colorway. Additionally, our team also installed 135 LF of white 6” aluminum seamless gutters onto the second story.

With storm season quickly approaching our client can rest easy knowing that their home is protected with a new roof from First Service!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Split Slate
  • Color: Coconut White Antique
  • Drip Edge Color: White

Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 135LF of new white 6″ aluminum seamless gutters on the second story.
  • Install up to (5) downspouts & (2) miters to match existing layout.
  • Jobsite will be cleaned of all work-related debris upon completion.

Shingle Roof Replacement & Gutter Installation For Fort Myers Condominium

Unfortunately this condominium neighborhood within Sparrowood At The Forest experienced storm damage as a result of Hurricane Irma. Upon inspection, it was determined that these buildings required a complete shingle re-roof to properly repair their roofing structures. First Service was contracted to carry out the complete roof replacements for these buildings along with installing new seamless gutters. Our team worked diligently to remove their existing roofs to make way for GAF’s weather watch mineral-surfaced leak barrier peel and stick, as well as GAF’s 130mph timberline HDZ shingles which are rated at wind speeds up to 130 mph. Once complete with the roofs, our team installed new seamless gutters to complete the project.

With a new roof from First Service, our clients can rest easy knowing that they are properly prepared for our upcoming storm season!

Special Materials:

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick
  • APOC Peel & Stick
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work:

Provide permit, labor, and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys. Note: We use a closed valley detail.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish. Standard color to be selected by Building Representative.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HD shingles, nailed with (6) nails per shingle, to plywood decking. Color to be selected by Building Representative. 11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  11. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  12. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  13. First Service will provide 2-year workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

 

Fort Myers Tile Roof Replacement & Repaint

Our office recently had the pleasure of serving the needs of a wonderful customer within the Gateway Greens community in Fort Myers Florida. Upon being contacted our team visited the residence to perform a roof inspection. With extensive damage on the roof, it was later determined that Hurricane Irma was the root cause of these damages and in order to properly repair, the home would need to receive a complete roof replacement. Once the project was approved we went to work removing the existing tile roof. Following the removal of the tile and installation of the appropriate underlayment, our team installed Boral’s Barcelona 900 tile in their gold dust color. Our team completed the roof and installed a new aluminum seamless gutter system as well to finish the project.

After our roofing team was complete, our painting division mobilized and completed a full exterior repaint using Sherwin Williams paint products. The end result turned out amazing and our customer’s selections beautifully transformed the exterior of this home!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Barcelona 900
  • Color: Gold Dust
  • Drip Edge Color: White

Re-Roof Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application.
  • Provide manufacturers warranties.

Gutter Installation Scope Of Work:

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 60LF of new white 6″ aluminum seamless gutters.
  • Install up to (3) downspouts to match existing layout.
  • Jobsite will be cleaned of all work-related debris upon completion.

Exterior Repaint:

  • PAINT MANUFACTURER: SHERWIN WILLIAMS PAINT PRODUCTS
  • PRIMER: LOXON MASONRY CONDITIONER
  • STUCCO SURFACES: SW SUPER PAINT SATIN
  • DOORS: SW SUPER PAINT SEMI-GLOSS
  1. TRENCH AROUND PERIMETER OF HOME 1 TO 3 INCHES.
  2. PRESSURE WASH EXTERIOR FREE OF DIRT AND FOREIGN MATERIAL
  3. APPLY A CONSISTENT COAT OF MASONRY SEALER TO STUCCO SURFACES
  4. CAULK WHERE NECESSARY AROUND DOORS, WINDOWS, AND J CHANNEL. SEAL MASONRY CRACKS, AS NEEDED, WITH ELASTOMERIC PATCHING COMPOUND
  5. APPLY A CONSISTENT COAT OF FINISH PAINT TO STUCCO WALLS AND EXTERIOR SIDE OF ENTRY & GARAGE DOORS

 

North Fort Myers Roof Replacement

Our roofing team was recently called to this North Fort Myers property to perform a residential roof inspection. Upon inspection, we found the roof to have numerous areas of damage and it was later determined that a complete roof replacement would be needed to properly address and fix the homes issues. Once approved, our roofing division went to work removing the existing roof to make way for the customer’s new Boral Barcelona 900 tile in their sterling color. After the roof was complete, our team also installed new 6″ aluminum seamless gutters to complete the project. This project turned out great and our homeowner couldn’t be happier with their new roof from First Service!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Barcelona 900
  • Color: Sterling
  • Drip Edge Color: White

Re-Roof Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide (2) year workmanship warranty on tile application.
  • Provide manufacturers warranties.

Gutter Install Scope Of Work:

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 50LF of new white 6″ aluminum seamless gutters.
  • Install up to (2) downspouts, (3) splash guards, (1) miters to match the existing layout.
  • Jobsite will be cleaned of all work-related debris upon completion.

Lehigh Acres Shingle Roof Repair

Our office was recently contacted to perform a roof inspection on a Lehigh Acres home. The homeowner was from out of town and purchased the home, with their insurance requiring the roof to be prepared. Upon inspection it was determined that the home would require a complete roof replacement to properly repair. Our team went to work and completed a thorough repair to the roof, closely matching the shingles until a complete replacement can take place. Once final approval is received from the insurance company, our team will carry out the complete shingle roof replacement.

Scope of Work:

Provide labor and materials to complete the following roof repair:

  1. Remove up to 15 shingles in affected area(s)
  2. Replace roof underlayment and or flashing
  3. Install new shingles that match as close as possible in color and style

Upon completion, the job site will be cleaned of all work-related debris.

First Service will provide a one-year workmanship warranty on this repair.

 

Shingle Re-Roof For Client In Cape Coral Florida

Our roofing division recently completed a roof replacement for a building located in Southwest Cape Coral. Upon inspection we found several areas on both the first and second story levels of this apartment building that we determined to have been damaged by Hurricane Irma. Our team made temporary repairs until the complete roof replacement could take place. Once approved our team removed the existing roofing structure and installed GAF’s Timberline HDZ shingles along with a new seamless aluminum gutter system. This project was completed on time and the building owner and tenants can rest assured that the structure is protected by a new roof installed by First Service!

Special Materials:

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick
  • APOC Peel & Stick
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work:

Provide permit, labor, and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of APOC Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2-year workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Provide labor and material to complete the following:

  1. Remove and dispose of the existing gutters and downspouts.
  2. Install up to 215LF of new sandtone 6″ aluminum seamless gutters on the first story.
  3. Install up to 50LF of new sandtone 6″ aluminum seamless gutters on the second story.
  4. Install up to (6) 1 story downspouts, (3) 2 story downspouts, (2) splash guards, (4) miters to match the existing layout.
  5. Job-site will be cleaned of all work-related debris upon completion.