Shadow Wood Preserve Tile Roof Replacement

Our office was recently contacted by a homeowner within the Shadow Wood Preserve community of Fort Myers Florida. Upon inspection of the roofing structure, it was determined that the roof had sustained damage as a result of Hurricane Irma and that a roof replacement would be required for proper repair. Following the removal of the existing roof, our team installed Boral’s Saxony Split Slate roofing tile in their coconut color, which really helped accent this home beautifully. Additionally, we also installed new white aluminum seamless gutters to the first story of the residence as well.

Our client can sleep easy now knowing that their home’s roof will protect them for years to come from Florida’s harsh weather and storm seasons!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Saxony Split Slate
  • Color: Coconut
  • Drip Edge Color: Tan

Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal. Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 40LF of new white 6″ aluminum seamless gutters on the first story.
  • Install up to (1) downspout, (2) splash guards, (2) miters to match existing layout.
  • Jobsite will be cleaned of all work-related debris upon completion.

Estero Florida Roof Replacement In The Stoneybrook Community

Our office recently had the pleasure of serving the roofing needs of a great customer in Estero Florida. This two story home situated within the Stoneybrook golf course community had been damaged after Hurricane Irma, and the homeowner contracted First Service to complete a roof replacement and gutter installation. Our roofing division mobilized and removed the existing roofing structure and replaced it with Eagle Capistrano tile in their Brown/Gray range colorway. We also installed new white aluminum seamless gutters on the second story of the home as well. The finished product turned out amazing and we’re grateful for the opportunity to serve the roofing needs of these Estero residents!

Special Materials:

  • Tile Manufacturer: Eagle
  • Style (Profile): Capistrano
  • Color: Brown Gray Range
  • Drip Edge Color: White

Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application.
  • Provide manufacturers warranties.

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 210LF of new white 6″ aluminum seamless gutters on the second story.
  • Install up to (6) downspouts, (4) miters to match existing layout.
  • Jobsite will be cleaned of all work-related debris upon completion.

Residential Tile Re-Roof For Estero Florida Home

Our office was recently contacted by a homeowner in Rookery Pointe to inspect their home’s roof. Their roof had sustained damage after Hurricane Irma, and following an inspection it was determined that the home would need a complete re-roof. Once contracted, our office carried out the roof replacement by first removing the home’s existing roof and then installing new Boral Barcelona 900 tile. Additionally, we also installed a new gutter system for the client to properly route water off of the roof.

This project turned out great, and both the homeowner and our office are ecstatic with the finished product!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Barcelona 900
  • Color: Citrus Clay
  • Drip Edge Color: White

Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 305LF of new white 6″ aluminum seamless gutters.
  • Install up to (8) downspouts, (2) splash guards, (16) miters to match existing layout.
  • Jobsite will be cleaned of all work related debris upon completion.

 

20 Year Old Roof Replacement For Cape Coral Home

We were recently contacted by a homeowner in Southwest Florida residing in Cape Coral with a request to inspect and ultimately replace their homes roof. Once awarded the contract, our team got to work removing the home’s existing roofing structure to then install GAF’s new Timberline® HDZ Shingles. These shingles are rated to 130 mph and perfectly suited for our severe Southwest Florida weather. This home also possessed a section of roof that was flat, and our team replaced and tied that section as well to the home’s new shingle roof system.

Following the roof replacement, we also installed new 6″ brown aluminum seamless guters around the entire perimeter eave of the home (while stopping at the screen enclosure). We’re thankful for the opportunity to serve our wonderful client, and are proud to showcase this project. Their new roof will serve the home well for years to come!

Special Materials:

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Shingle Roof Scope Of Work:

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys. Note: We use a closed valley detail.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish. Standard color to be selected by Building Representative.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking. Color to be selected by Building Representative.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2-year workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Flat Roof Scope Of Work:

Provide permit, labor, and materials to complete the following:

  1. Remove roof covering and underlayment.
  2. Re-nail decking to local hurricane mitigation code.
  3. Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  4. The flat roof will be replaced using Polyglass peel and stick base sheet and topped with Polyglass torch down cap sheet.
  5. Tie in flat roof with shingle tie in.

Gutter System Scope Of Work:

Provide the following scope of work to the exterior gutters of the home:

  1. Install 215LF of new 6″ brown aluminum seamless gutters around the entire perimeter eave of the house stopping at the screen enclosure.
  2. Install “5” new Royal Brown downspouts in locations approved by the homeowner. –
  3. Install “4” corner strip miters, “1” inside miters and “3” outside miters.
  4. Install “1” splash guard, one on each inside corner at the base of each roof valley.
  5. Upon completion the job site will be cleaned of all work-related debris.

Fort Myers Commercial Shingle and Flat Re-roof Installation

Our office was recently contracted by a Fort Myers country club to repair damage sustained to their roofing structure as a result of Hurricane Irma. Our roofing division repaired the roofing structure on seven buildings, and also installed complete gutter systems accordingly. This project turned out great and we’re thankful for the opportunity to serve our great customer!

Special Materials:

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system
  • SHAKEWOOD SHINGLES, ALMOND DRIP EDGE

Scope Of Work:

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys. Note: We use a closed valley detail.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2-year workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Estero Home Receives A Roof Replacement, Gutter Installation, and Re-Paint

A homeowner in Estero Florida’s beautiful Pelican Sound community recently contacted our company with a need for tile roof repairs. Upon inspection, it was determined that the home’s roof was damaged as a result of Hurricane Irma which warranted a complete roof replacement to properly address and fix the roof. The homeowner also contracted our company to install a new gutter system, along with a complete repaint of the home’s exterior. The finished product came out stunning and the exterior of our customer’s home completely transformed!

Roofing Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code. Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Gutter Installation Scope Of Work:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 80LF of new white 6″ aluminum seamless gutters.
  • Install up to (2) downspouts, (3) splash guards, (3) miters to match existing layout.
  • Install gutter guards on 80LF of new gutters.

Exterior Repaint Scope Of Work:

  • Exterior Repaint Paint Manufacturer: Sherwin Williams Paint Products
  • Primer: Loxon Masonry Conditioner
  • Stucco Surfaces, Ceilings: SW Duration Satin
  • Doors: SW Duration Semi-Gloss
  1. Trench around perimeter of home 1 to 3 inches.
  2. Pressure wash exterior free of dirt and foreign material.
  3. Apply one coat of masonry sealer to stucco surfaces.
  4. Caulk where necessary around doors, windows, and j channel.
  5. Seal masonry cracks, as needed, with elastomeric patching compound.
  6. Apply one coat of SW Duration satin paint, using brush and roll technique to stucco walls, ceilings, fascia, soffit, bands, and trim
  7. Apply one coat of SW Duration semi-gloss paint to the exterior side of entry and garage doors
  8. Colors to be selected by owner

Note: 10-year limited labor and materials warranty will be issued by Sherwin Williams.

Pelican Sound Golf & River Club Roof Replacement

Our office was contacted recently by a resident of the Pelican Sound Golf & River Club in Estero Florida, to schedule a roof inspection for their home. Upon inspection, damage was found that was determined to be a result of Hurricane Irma which prompted a need for a complete tile roof replacement to take place. The customer also had our team install a new gutter system for their roof as well. The removal of the home’s existing roof, and installation of their new roof went smoothly and the final result speaks for itself!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Villa 900
  • Color: Arbor Green
  • Drip Edge Color: white

Re-Roof Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application.
  • Provide manufacturers warranties.

Gutter Installation Scope Of Work:

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 95LF of new white mastic 6″ aluminum seamless gutters.
  • Install up to (3) downspouts, (4) splash guards, (3) miters to match existing layout.

Estero Florida Tile Roof Replacement And Gutter Installation

Our roofing division was recently contracted to re-roof a home within the Rookery Pointe Community in Estero Florida. Upon inspection, the damage on our customer’s roof was determined to be a result of Hurricane Irma and First Service was hired to replace the existing roofing structure. Our team removed the existing roof and installed new Boral Estate tile along with a complete gutter system. The final product turned out amazing, and our customers are ecstatic with their new roof!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Estate
  • Color: Delcrest Tan
  • Drip Edge Color: White

Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 225LF of new white 6″ aluminum seamless gutters.
  • Install up to (7) downspouts, (2) splash guards, (4) miters to match existing layout.

Another Tile Roof Replacement Completed In Estero Florida

As the week progresses, we’re happy to showcase yet another tile roof replacement completed for a beautiful home in Estero Florida. It was determined during a roof inspection that this home had sustained damage as a result of Hurricane Irma. Following the inspection, our roofing division was contracted to remove the existing roof, and install a new tile roof and gutter system. The finished product turned out amazing, and our homeowners can rest assured that their home is protected from our harsh Southwest Florida weather for many years to come.

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Estate
  • Color: Pinto Blend
  • Drip Edge Color: White

Re-Roof Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application.
  • Provide manufacturers warranties.

Gutter Installation Scope Of Work:

Provide labor and material to complete the following.

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 245LF of new white 6″ aluminum seamless gutters.
  • Install up to (7) downspouts, (2) splash guards, (5) miters to match existing layout.

Roof Replacement For Home In Estero Florida

Our roofing division recently had the pleasure of serving a wonderful customer in the Cascades community located in Estero Florida. Following a roof inspection, we found the roof to be damaged as a result of Hurricane Irma. Our office assisted the homeowner by performing a complete roof replacement and gutter installation. After we removed the existing roof, our team installed new Barcelona 900 Boral tile on this gorgeous home. We would like to thank our customer for entrusting our roofing division to perform their roof repairs, and welcome the opportunity to serve their roofing needs in the future.

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Barcelona 900
  • Color: Irving Blend
  • Drip Edge Color: White

Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 180LF of new white 6″ aluminum seamless gutters.
  • Install up to (6) downspouts, (2) splash guards, (2) miters to match existing layout.