Tile Roof Replacement Completed For Beautiful Home In Quail West

Our office was recently contracted by a homeowner in Naples Florida in need of a roof replacement. Upon inspection it was determined that the home’s roofing structure was damaged as a result of Hurricane Irma, and that a full roof replacement would be needed. Our roofing team mobilized and visited the beautiful Quail West home community to serve our customer. We removed the existing roofing structure and installed 8,595 square feet of Boral Saxony 900 slate tile on the home’s roof. This tile helped accent the home beautifully and also aided in transforming the exterior profile of this amazing home.

We’re thankful for the opportunity to serve the roofing needs of our great customer, and welcome the opportunity to solve your roofing issues should the need arise. If your Southwest Florida home’s roof is in need of a roof repair or replacement, contact our office today to schedule a complimentary roof inspection!

Quail West Home Aerial Layout
Aerial Layout Of Home

 

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Saxony 900 Slate
  • Color: Stone Mountain Blend
  • Drip Edge Color: White

Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • 10k lift needed for two story and size of building

Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

 

 

Cape Coral Home Exterior Repaint and Interior Paint Touch-Up

Our office was recently contacted by a homeowner in Cape Coral, FL searching for a full-service painting company to update their home. We gladly assisted and proceeded to repaint the exterior of the home, and also touch up areas inside the home. The homeowner’s color selections look great, and helped to truly transform this beautiful home!

Special Materials:

  • Paint Manufacturer: Sherwin Williams Paint Products
  • Primer: Loxon Masonry Conditioner
  • Stucco Surfaces: SW Super Paint Satin
  • Doors: SW Super Paint Semi-Gloss
  • Interior walls: One coat of Super Paint Egg-Shell or Flat Latex Paint
  • Ceilings: One coat of Super Paint Flat Latex Paint
  • Doors and trim: One coat of Scott All grip Semi-gloss Paint

Scope Of Work For Exterior Repaint:

  1. Trench around perimeter of home 1 to 3 inches.
  2. Pressure wash exterior free of dirt and foreign material
  3. Apply a consistent coat of masonry sealer to stucco surfaces
  4. Caulk where necessary around doors, windows, and j channel. Seal masonry cracks, as needed, with elastomeric patching compound
  5. Apply a consistent coat of finish paint to stucco walls and exterior side of entry & garage doors
  6. 7-year limited labor and materials warranty issued by Sherwin Williams.

Scope Of Work For Interior Paint Touch-Up:

Provide labor and materials to complete the following items to be painted:

  1. Living Room/Hallway Trim Touch Ups: Touch up around ceiling with matching paint & Paint Trim in hallway (excluding door casements)
  2. Living Room: Paint areas where brown with Super Paint White Satin & Paint all trim in living room with semi-gloss
  3. Kitchen/Dining Room Walls: Paint walls to match Grey Satin
  4. Move all furniture to center of room. Protect furnishing and floors from paint drips with drop cloths and or plastic.
  5. Prepare wall and ceiling surfaces to be painted and prime as needed.
  6. Sand doors and trim and wipe with de-glosser.
  7. Caulk as needed wood to wood and wood to drywall joints.

20 Year Old Roof Replacement For Cape Coral Home

We were recently contacted by a homeowner in Southwest Florida residing in Cape Coral with a request to inspect and ultimately replace their homes roof. Once awarded the contract, our team got to work removing the home’s existing roofing structure to then install GAF’s new Timberline® HDZ Shingles. These shingles are rated to 130 mph and perfectly suited for our severe Southwest Florida weather. This home also possessed a section of roof that was flat, and our team replaced and tied that section as well to the home’s new shingle roof system.

Following the roof replacement, we also installed new 6″ brown aluminum seamless guters around the entire perimeter eave of the home (while stopping at the screen enclosure). We’re thankful for the opportunity to serve our wonderful client, and are proud to showcase this project. Their new roof will serve the home well for years to come!

Special Materials:

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Shingle Roof Scope Of Work:

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys. Note: We use a closed valley detail.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish. Standard color to be selected by Building Representative.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking. Color to be selected by Building Representative.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2-year workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Flat Roof Scope Of Work:

Provide permit, labor, and materials to complete the following:

  1. Remove roof covering and underlayment.
  2. Re-nail decking to local hurricane mitigation code.
  3. Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  4. The flat roof will be replaced using Polyglass peel and stick base sheet and topped with Polyglass torch down cap sheet.
  5. Tie in flat roof with shingle tie in.

Gutter System Scope Of Work:

Provide the following scope of work to the exterior gutters of the home:

  1. Install 215LF of new 6″ brown aluminum seamless gutters around the entire perimeter eave of the house stopping at the screen enclosure.
  2. Install “5” new Royal Brown downspouts in locations approved by the homeowner. –
  3. Install “4” corner strip miters, “1” inside miters and “3” outside miters.
  4. Install “1” splash guard, one on each inside corner at the base of each roof valley.
  5. Upon completion the job site will be cleaned of all work-related debris.

Fort Myers Commercial Shingle and Flat Re-roof Installation

Our office was recently contracted by a Fort Myers country club to repair damage sustained to their roofing structure as a result of Hurricane Irma. Our roofing division repaired the roofing structure on seven buildings, and also installed complete gutter systems accordingly. This project turned out great and we’re thankful for the opportunity to serve our great customer!

Special Materials:

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system
  • SHAKEWOOD SHINGLES, ALMOND DRIP EDGE

Scope Of Work:

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys. Note: We use a closed valley detail.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2-year workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Fort Myers Commercial Shingle Roof Replacement

Our company was recently contacted by a community in Fort Myers to repair roof damage sustained as a result of Hurricane Irma. Leaks were discovered in the clubhouse which prompted a search for an experienced commercial roofer to complete the work. Our company was awarded a contract and have completed roof replacements on four units within the community thus far. As this project is still ongoing, our roofing division is currently working to complete additional roof replacements on other buildings for our client.

We’re thankful for the opportunity to serve our wonderful client and their roofing needs, and can’t wait to show you the final product!

Special Materials:

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system
  • Shingle Color: GAF SHAKEWOOD
  • Drip Edge: Cream

Scope Of Work:

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys. Note: We use a closed valley detail.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish. Standard color to be selected by Building Representative.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2-year workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Estero Florida Residential Tile Roof Replacement Completed

Our office was recently contacted by a homeowner in Estero Florida’s Grandezza community with a damaged roof. Upon inspection, it was determined that the sustained damage to the home’s roofing structure was caused by Hurricane Irma. Our roofing division worked with the homeowner to complete a tile roof replacement on their two story home. We removed the existing roof and installed Boral Barcelona 900 tile on the home. The finished roof replacement turned out great, and our customers are happy with their new roof!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Barcelona 900
  • Color: Cedar Tan
  • Drip Edge Color: Beige

Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code. Inspect existing decking.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Fort Myers Shingle Roof Installation & Exterior Repaint

Our office was recently contacted by a Fort Myers homeowner searching for a company to perform a roof replacement. We inspected the home and were hired to carry out an asphalt shingle roof replacement along with an exterior repaint. Our roofing and painting divisions worked together to complete the job, transforming the exterior of this beautiful Fort Myers home. We love how the project turned out and are thankful for the opportunity to serve both the painting and roofing needs of our great customer!

Special Materials:

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system
  • PAINT MANUFACTURER: SHERWIN WILLIAMS PAINT PRODUCTS
  • PRIMER: LOXON MASONRY CONDITIONER
  • STUCCO SURFACES: SW SUPER PAINT SATIN
  • DOORS: SW SUPER PAINT SEMI-GLOSS

Roofing Scope Of Work:

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys. Note: We use a closed valley detail.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish. Standard color to be selected by Building Representative.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking. Color to be selected by Building Representative.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 5-year workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Painting Scope Of Work

Provide labor and materials to complete the following:

  1. TRENCH AROUND PERIMETER OF HOME 1 TO 3 INCHES.
  2. APPLY A CONSISTENT COAT OF MASONRY SEALER TO STUCCO SURFACES
  3. CAULK WHERE NECESSARY AROUND DOORS, WINDOWS, AND J CHANNEL. SEAL MASONRY CRACKS, AS NEEDED, WITH ELASTOMERIC PATCHING COMPOUND
  4. APPLY A CONSISTENT COAT OF FINISH PAINT TO STUCCO WALLS AND EXTERIOR SIDE OF ENTRY, SOFFIT, FASCIA, GUTTER & GARAGE DOORS
  5. COLORS TO BE SELECTED BY OWNER
  6. LANAI DRYWALL REPAIR IS INCLUDED IN THIS PRICING. Remove 4 affected taped drywall seams 8LF each Tape and mud drywall seams 8LF each Match existing texture to match existing Prime with oil-based primer
  7. A 7- year limited labor and materials warranty will be issued by Sherwin Williams.

Estero Home Receives A Roof Replacement, Gutter Installation, and Re-Paint

A homeowner in Estero Florida’s beautiful Pelican Sound community recently contacted our company with a need for tile roof repairs. Upon inspection, it was determined that the home’s roof was damaged as a result of Hurricane Irma which warranted a complete roof replacement to properly address and fix the roof. The homeowner also contracted our company to install a new gutter system, along with a complete repaint of the home’s exterior. The finished product came out stunning and the exterior of our customer’s home completely transformed!

Roofing Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code. Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Gutter Installation Scope Of Work:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 80LF of new white 6″ aluminum seamless gutters.
  • Install up to (2) downspouts, (3) splash guards, (3) miters to match existing layout.
  • Install gutter guards on 80LF of new gutters.

Exterior Repaint Scope Of Work:

  • Exterior Repaint Paint Manufacturer: Sherwin Williams Paint Products
  • Primer: Loxon Masonry Conditioner
  • Stucco Surfaces, Ceilings: SW Duration Satin
  • Doors: SW Duration Semi-Gloss
  1. Trench around perimeter of home 1 to 3 inches.
  2. Pressure wash exterior free of dirt and foreign material.
  3. Apply one coat of masonry sealer to stucco surfaces.
  4. Caulk where necessary around doors, windows, and j channel.
  5. Seal masonry cracks, as needed, with elastomeric patching compound.
  6. Apply one coat of SW Duration satin paint, using brush and roll technique to stucco walls, ceilings, fascia, soffit, bands, and trim
  7. Apply one coat of SW Duration semi-gloss paint to the exterior side of entry and garage doors
  8. Colors to be selected by owner

Note: 10-year limited labor and materials warranty will be issued by Sherwin Williams.

Cape Coral Home: Asphalt Shingle Roof Replacement

Our office was recently contacted by a Cape Coral homeowner with a need to service their home’s 27 year old roof. Our office worked with the homeowner to remove the existing roofing structure to complete a roof replacement using GAF’s Timberline HDZ 130 mph rated asphalt shingles. These shingles will ensure that the home is protected for many storm seasons to come! The roof comes with a 2 year workmanship warranty as well as a GAF system plus 50 year non-prorated warranty which applies to any GAF material installed on the roof.

Special Materials:

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work:

Provide permit, labor, and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis. See disclaimer.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys. Note: We use a closed valley detail.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish. Standard color to be selected by Building Representative.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking. Color to be selected by Building Representative.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2-year workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Fort Myers Shingle Re-Roof Completed

Our office was recently contacted by a homeowner in Fort Myers Florida with a need to replace her 20 year old roof. Following the inspection of the home’s roofing structure, we advised the homeowner of their options and they selected a new shingle roof using GAF products. Our team installed GAF’s Timberline HDZ shingles, which are rated to 130 mph. We were able to quickly complete the project in the middle of storm season, ensuring that our customer received a new roof to protect their home from storms for the rest of this year, as well as years to come!

Special Materials:

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work:

Provide permit, labor, and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys. Note: We use a closed valley detail.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking. Color to be selected by Building Representative.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2-year workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.