Roof Replacement For Fort Myers Beach Vacation Villas

Our roofing division recently had the privilege of working with Polynesian Village Vacation Villas on Fort Myers beach. Following roof damage from Hurricane Irma, it was determined that roof replacements were needed for several structures on the property. Our team completed shingle roof replacements and gutter installations for these one and two story buildings. In addition, we also completed a re-roof for a flat roofing structure. These roofs came out great, and will serve our customer for years to come!

Special Materials

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work

Provide permit, labor, and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis. See disclaimer.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install (1) layer of peel and stick on low slope area and (1) layer of cap sheet on low slope area.
  7. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys.
  8. Install 26 GA galvalume kitchen and dryer vents.
  9. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish.
  10. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  11. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking.
  12. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  13. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  14. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  15. First Service will provide 2-yr workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.
Provide permit, labor and materials to complete the following:
  • Remove roof covering and underlayment.
  • Re-nail decking to local hurricane mitigation code.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter. The flat roof will be replaced using Polyglass peel and stick base sheet and topped with Polyglass torch down cap sheet.
Provide labor and material to complete gutter installation for these one- and two-story buildings:
  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 130LF of new white 6″ aluminum seamless gutters on the first story. (office building)
  • Install up to 285LF of new white 6″ aluminum seamless gutters on the second story. (2 story building)
  • Install up to (14) downspouts and (6) miters to match existing layout.

Cape Coral Asphalt Shingle Roof Replacement

Our roofing division was contacted to inspect a shingle roof in Cape Coral Florida for damage. The roof had experienced damage from Hurricane Irma and it was determined that a roof replacement was required. We sprung into action and were able to remove the existing roofing structure, and replace with GAF 130mph rated Timberline HDZ shingles. In addition to the new roof, this beautiful home also received a new seamless gutter system to complete the project.

Special Materials

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish. Standard color to be selected by Building Representative.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking. Color to be selected by Building Representative.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2yr workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Provide labor and material to complete the gutter system:

  1. Install up to 45LF of new white 6″ aluminum seamless gutters on front of house.
  2. Install up to (2) downspouts, (1) miters to match existing layout.

Shingle Roof Replacement For A Cape Coral Home

Our office was contacted to inspect a home’s 23 year old roofing structure. Upon inspection, it was determined that the existing roof had a number of leaks and required a complete shingle roof replacement. As our roofing division completed the home’s re-roof, we also reinstalled fascia and soffit around the front doorway and left side of the home. Loose fascia was secured around the entire home, and the drip edge and fascia that tied into the walls was resealed. We also reinstalled the gutter on the left corner of the home and sealed all cuts in the drip edge in the customer’s gutter ends. Our customer can rest easy knowing that their home is protected by GAF’s 130 MPH rated Timberline HDZ shingles!

Special Materials

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • 26 GA – 16″ – Mill (50′) galvalume valley metal
  • 26 GA galvalume kitchen and dryer vents
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2yr workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Tile Roof Replacement For Estero Home

Our roofing division was recently contacted by a homeowner who’s home had been damaged during Hurricane Irma. Upon inspecting their existing roof structure, it was determined that the client’s home required a complete tile roof replacement. Once approved, our roofing teams mobilized to remove the client’s existing tile roof, and install a new Boral tile roof. The project was completed in an efficient manner, working around our Southwest Florida summer weather, and both the client and ourselves are ecstatic with the results! Our client can now rest assured that their home is adequately prepared for both this year’s and future storm seasons.

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Villa 900
  • Color: New Southern Blend
  • Drip Edge Color: Cream

Re-Roof Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Cape Coral Home Interior Repaint

Our office was recently contacted by a veteran PE teacher in Cape Coral who was missing the interactions with her students when schools were forced to close due to the Coronavirus. She decided to make the best of things, and hired our company to repaint her master bedroom and kitchen. Our painting division prepared and painted our customers home in record time, completely transforming her interior space in these areas of the home. It’s always a pleasure to serve those who serve our community!

Special Materials

  • Sherwin Williams Products:
  • Florida Knock Down Texture
  • Extreme Primer
  • All Grip Semi-Gloss White
  • Superior Paint
  • Super Paint Satin

Scope Of Work

Provide labor and material for the following:

  • Paint master bedroom entry pocket door both sides and casing
  • Paint hall to master bedroom, door, and casings
  • Re-texture kitchen and paint to match existing color
  • Sand wood panel wall, prime and paint to match existing color

Naples Bathroom Remodel

Our restoration division was recently contracted to remodel a bathroom in Sorrento Villas, a condominium community in Naples Florida. We quickly and efficiently served the needs of our wonderful client and love how this bathroom turned out!

Scope Of Work

  • Install new wood furring at walls at shower area
  • Install new shower pan and drain
  • Install new mud bed to provide proper height and pitch
  • Form and install new shower curb with marble sill
  • Install insulation at block wall
  • Install moisture resistant green board at walls in shower
  • Install construction grade 6 X 6 tile at shower area and grout
  • Reinstall existing handicap bars and ceramic towel bars
  • Reinstall existing trim for diverter
  • Remove and reset toilet
  • Replace up to one sheet of drywall at other areas in bathroom.
  • Texture new drywall to match existing
  • Prime and Paint all areas where new drywall was installed to match existing color
  • Install up to 10 LF of baseboard, caulk and seal.
  • Rehang existing bathroom door

Fort Myers Exterior Home Repaint

At First Service CGC, we regularly receive the opportunity to work on a myriad of projects. Our team recently had the pleasure of working with a Fort Myers homeowner to update the look of their home. We repainted the exterior of the home, along with the deck area to give this residence a fresh, new look. Did I mention that we love how the finished product turned out!

Special Materials:

  • Paint Manufacturer: Sherwin Williams Paint Products
  • Primer: Loxon Masonry Conditioner
  • Stucco Surfaces: SW Super Paint Satin
  • Doors: SW Super Paint Semi-Gloss

Scope Of Work:

  1. Trench around perimeter of home 1 to 3 inches.
  2. Pressure wash exterior free of dirt and foreign material.
  3. Apply a consistent coat of masonry sealer to stucco surfaces.
  4. Caulk where necessary around doors, windows, and j channel. Seal masonry cracks, as needed, with elastomeric patching compound.
  5. Apply a consistent coat of finish paint to stucco walls and exterior side of entry & garage doors.
  6. 7-year limited labor and materials warranty issued by Sherwin Williams.
shingle roof repair

Cape Coral Shingle Roof Repair

At First Service, we regularly serve the roofing, painting, and restoration needs of property management companies throughout Southwest Florida . We were recently contracted to make repairs to a multifamily unit requiring a shingle repair for a small leak in the roof. Our roofing division mobilized and remedied the issue for our client in record time. With storm season in full swing here in Southwest Florida, it is imperative to ensure that your facilities roof structure is free of issues. If you suspect a roof leak, or would like to make sure that your roof is ready for Florida’s famous summer weather, contact our office today to schedule a free roof inspection.

Scope Of Work

Provide Labor and Materials To Complete The Following Roof Repair:

  1. Remove shingles in affected area(s) at power mast where previous repair was performed
  2. Replace roof underlayment as needed
  3. Install new shingles that match as close as possible in color and style
  4. Repair missing shingles over specified unit

Warranty: First Service will provide a one-year workmanship warranty on this repair

Build It and They Will Come!

D’Vontay Friga, YouTube sensation and Division 3 basketball star at University of Mount Union in Alliance, Ohio, was slated to win the championship game his senior year when everything came to an abrupt halt due to the pandemic. Instead of letting this become a setback, he showcased his basketball skills and love of community on YouTube!  His father, local contractor and owner of Friga Tyme Corp. built a basketball court in North Fort Myers! Parks were closed and this was a way to continue play in a safe and small group setting during quarantine. First Service painted the court purple for the Purple Raiders! D’Vontay intends to continue using the court to organize tournaments and charity events to give back to the community!

Residential Shingle Roof Replacement and Repaint For Cape Coral Home

This homeowner selected First Service to replace a section of their homes roof and we so pleased with the service received, that they hired our company to repaint the exterior of their home as well. Both our painting and roofing divisions worked together to service the needs of our customer’s Cape Coral home and we are thrilled with the end result. One of the many benefits of working with our company is the ability to structure roofing, painting, and restoration under one roof. This allows us to provide both residential and commercial customers a “one stop shop” for property repairs and maintenance.

Special Materials:

  • Manufacturer: TAMKO HERITAGE – Shingles
  • Tamko Moisture Guard – Underlayment
  • Paint Manufacturer: Sherwin Williams
  • Primer: Loxon Masonry Conditioner
  • Stucco Surfaces: SW Super Paint Satin
  • Doors: SW Super Paint Semi-Gloss

Scope Of Work For Shingle Roof Replacement:

Provide permit, labor, and materials to complete the following:

  • Remove roof covering and underlayment.
  • Re-nail decking to local hurricane mitigation code with Magnum Zinc Coil Nails – .113″x2 3/8″ ring shank.
  • Install Whip 100 self-adhered peel and stick underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys, closed valley detail.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install new lead flashing around all plumbing stacks.
  • Install a new 130mph Architectural Asphalt shingle roof system as per manufacturer specifications.

Scope Of Work For Exterior Re-paint:

  1. TRENCH AROUND PERIMETER OF HOME 1 TO 3 INCHES.
  2. PRESSURE WASH EXTERIOR FREE OF DIRT AND FOREIGN MATERIAL
  3. REPAIR STUCCO COLUMN ON LEFT SIDE OF ENTRY
  4. APPLY A CONSISTENT COAT OF MASONRY SEALER TO STUCCO SURFACES
  5. CAULK WHERE NECESSARY AROUND DOORS, WINDOWS, AND J CHANNEL. SEAL MASONRY CRACKS, AS NEEDED, WITH ELASTOMERIC PATCHING COMPOUND
  6. APPLY A CONSISTENT COAT OF FINISH PAINT TO STUCCO WALLS AND EXTERIOR SIDE OF ENTRY & GARAGE DOORS
  7. APPLY A CONSISTENT COAT OF FINISH PAINT USING SPRAY TECHNIQUE TO FASICA AND SOFFIT