Cape Coral Home Shingle Roof Replacement

A homeowner in Cape Coral Florida recently contacted our office to schedule a roof inspection to look for damage on their roof. Upon inspecting the customer’s roof, we found damaged that was ultimately determined to be caused by Hurricane Irma. We worked with the customer to help them obtain a new roof through Elite claims, and proceeded to carry out the contracted work agreed upon. Our roofing division removed the existing roofing structure and installed new 130 mph rated GAF Timberline HDZ shingles in their place. The final product turned out great, and our customer can rest assured that their home’s new roof will protect them for many storm seasons to come.

Special Materials:

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work:

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys. Note: We use a closed valley detail.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2yr workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Pelican Sound Golf & River Club Roof Replacement

Our office was contacted recently by a resident of the Pelican Sound Golf & River Club in Estero Florida, to schedule a roof inspection for their home. Upon inspection, damage was found that was determined to be a result of Hurricane Irma which prompted a need for a complete tile roof replacement to take place. The customer also had our team install a new gutter system for their roof as well. The removal of the home’s existing roof, and installation of their new roof went smoothly and the final result speaks for itself!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Villa 900
  • Color: Arbor Green
  • Drip Edge Color: white

Re-Roof Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application.
  • Provide manufacturers warranties.

Gutter Installation Scope Of Work:

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 95LF of new white mastic 6″ aluminum seamless gutters.
  • Install up to (3) downspouts, (4) splash guards, (3) miters to match existing layout.

Estero Florida Tile Roof Replacement And Gutter Installation

Our roofing division was recently contracted to re-roof a home within the Rookery Pointe Community in Estero Florida. Upon inspection, the damage on our customer’s roof was determined to be a result of Hurricane Irma and First Service was hired to replace the existing roofing structure. Our team removed the existing roof and installed new Boral Estate tile along with a complete gutter system. The final product turned out amazing, and our customers are ecstatic with their new roof!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Estate
  • Color: Delcrest Tan
  • Drip Edge Color: White

Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 225LF of new white 6″ aluminum seamless gutters.
  • Install up to (7) downspouts, (2) splash guards, (4) miters to match existing layout.

Shingle Roof Replacement Bonita Springs, FL

We were recently contacted by a Bonita Springs Florida homeowner in the beautiful community of Vanderbilt Lakes looking for a company to service their roof. Once inspected, it was determined that a complete roof replacement would be needed to repair the damage sustained from Hurricane Irma. Our roofing division removed the existing roof structure and completed a shingle re-roof for our customer in record time. The roof came out amazing, and our customer can rest easy knowing that their home is protected for many storm seasons to come!

Special Materials:

  • Manufacturer: TAMKO HERITAGE – Shingles
  • TAMKO MOISTURE GUARD – Underlayment
  • Color Selection Shingles: Thunderstorm Grey
  • Drip Edge Color: WHITE
  • Resisto peel & stick underlayment
  •  130mph Architectural Asphalt shingle

Scope Of Work:

Provide permit, labor, and materials to complete the following:

  • Remove roof covering and underlayment.
  • Re-nail decking to local hurricane mitigation code with Magnum Zinc Coil Nails – .113″x2 3/8″ ring shank.
  • Install Resisto peel & stick underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents. Install new lead flashing around all plumbing stacks.
  • Install a new 130mph Architectural Asphalt shingle roof system as per manufacturer specifications.

Another Tile Roof Replacement Completed In Estero Florida

As the week progresses, we’re happy to showcase yet another tile roof replacement completed for a beautiful home in Estero Florida. It was determined during a roof inspection that this home had sustained damage as a result of Hurricane Irma. Following the inspection, our roofing division was contracted to remove the existing roof, and install a new tile roof and gutter system. The finished product turned out amazing, and our homeowners can rest assured that their home is protected from our harsh Southwest Florida weather for many years to come.

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Estate
  • Color: Pinto Blend
  • Drip Edge Color: White

Re-Roof Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application.
  • Provide manufacturers warranties.

Gutter Installation Scope Of Work:

Provide labor and material to complete the following.

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 245LF of new white 6″ aluminum seamless gutters.
  • Install up to (7) downspouts, (2) splash guards, (5) miters to match existing layout.

Roof Replacement For Home In Estero Florida

Our roofing division recently had the pleasure of serving a wonderful customer in the Cascades community located in Estero Florida. Following a roof inspection, we found the roof to be damaged as a result of Hurricane Irma. Our office assisted the homeowner by performing a complete roof replacement and gutter installation. After we removed the existing roof, our team installed new Barcelona 900 Boral tile on this gorgeous home. We would like to thank our customer for entrusting our roofing division to perform their roof repairs, and welcome the opportunity to serve their roofing needs in the future.

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Barcelona 900
  • Color: Irving Blend
  • Drip Edge Color: White

Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 180LF of new white 6″ aluminum seamless gutters.
  • Install up to (6) downspouts, (2) splash guards, (2) miters to match existing layout.
tile roof replacement for a home in estero florida

Rookery Pointe Tile Roof Replacement

Our roofing division recently completed a tile roof replacement for a two-story home located within Rookery Pointe in Estero Florida. The roofing structure of this residence upon inspection, was found to have sustained damage determined to be a result of Hurricane Irma. Our team mobilized and was able to help obtain the homeowner a new roof, as well as install it in a timely fashion to help ensure their home was properly protected from our severe summer weather here in Southwest Florida. We’re thrilled with how this project turned out and are grateful for the opportunity to be of service to our wonderful community.

If you feel your roof may be in need of repair, contact our office today for a FREE roof inspection. We welcome the opportunity to educate you of your options, and earn your business!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Saxony 900 Split Slate
  • Color: Lignite – Black Antique
  • Drip Edge Color: White

Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents. Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.
Bonita Springs Roof Replacement

Bonita Springs Roof Replacement

Our roofing division was recently contacted to repair the roof of a home located in the Copperleaf Golf Course community in Bonita Springs Florida. This beautiful home was unfortunately damaged as a result of Hurricane Irma, and following a roof inspection, it was determined a roof replacement was needed. We removed the existing tile roof and installed a new roofing structure with foam adhesion and or two screw fastener application system per manufacturer specifications. The new roof accented this home nicely, and our homeowner can rest assured that their home is protected for many storm seasons to come!

Scope Of Work

Provide permit, labor, and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code. Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Lehigh Acres Roof Replacement

Our office was recently contacted by a resident in the Sherwood neighborhood of Lehigh Acres Florida in need of a roof inspection. Upon inspection of the homeowner’s roofing structure, we discovered damage that was found to be a result of Hurricane Irma.  Following the roof inspection it was determined that a complete roof replacement for this Lehigh Acres home was needed. Our roofing team proceeded to remove the existing roof structure and install new GAF Timberline HDZ shingles to complete the re-roof on this home. The end result turned out great, and our customer can rest assured that their home is protected for both this current storm season and many to come!

Special Materials

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2yr workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Roof Replacement For Fort Myers Beach Vacation Villas

Our roofing division recently had the privilege of working with Polynesian Village Vacation Villas on Fort Myers beach. Following roof damage from Hurricane Irma, it was determined that roof replacements were needed for several structures on the property. Our team completed shingle roof replacements and gutter installations for these one and two story buildings. In addition, we also completed a re-roof for a flat roofing structure. These roofs came out great, and will serve our customer for years to come!

Special Materials

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work

Provide permit, labor, and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis. See disclaimer.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install (1) layer of peel and stick on low slope area and (1) layer of cap sheet on low slope area.
  7. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys.
  8. Install 26 GA galvalume kitchen and dryer vents.
  9. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish.
  10. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  11. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking.
  12. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  13. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  14. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  15. First Service will provide 2-yr workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.
Provide permit, labor and materials to complete the following:
  • Remove roof covering and underlayment.
  • Re-nail decking to local hurricane mitigation code.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter. The flat roof will be replaced using Polyglass peel and stick base sheet and topped with Polyglass torch down cap sheet.
Provide labor and material to complete gutter installation for these one- and two-story buildings:
  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 130LF of new white 6″ aluminum seamless gutters on the first story. (office building)
  • Install up to 285LF of new white 6″ aluminum seamless gutters on the second story. (2 story building)
  • Install up to (14) downspouts and (6) miters to match existing layout.