Estero Florida Tile Roof Replacement And Gutter Installation

Our roofing division was recently contracted to re-roof a home within the Rookery Pointe Community in Estero Florida. Upon inspection, the damage on our customer’s roof was determined to be a result of Hurricane Irma and First Service was hired to replace the existing roofing structure. Our team removed the existing roof and installed new Boral Estate tile along with a complete gutter system. The final product turned out amazing, and our customers are ecstatic with their new roof!

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Estate
  • Color: Delcrest Tan
  • Drip Edge Color: White

Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 225LF of new white 6″ aluminum seamless gutters.
  • Install up to (7) downspouts, (2) splash guards, (4) miters to match existing layout.

Another Tile Roof Replacement Completed In Estero Florida

As the week progresses, we’re happy to showcase yet another tile roof replacement completed for a beautiful home in Estero Florida. It was determined during a roof inspection that this home had sustained damage as a result of Hurricane Irma. Following the inspection, our roofing division was contracted to remove the existing roof, and install a new tile roof and gutter system. The finished product turned out amazing, and our homeowners can rest assured that their home is protected from our harsh Southwest Florida weather for many years to come.

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Estate
  • Color: Pinto Blend
  • Drip Edge Color: White

Re-Roof Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application.
  • Provide manufacturers warranties.

Gutter Installation Scope Of Work:

Provide labor and material to complete the following.

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 245LF of new white 6″ aluminum seamless gutters.
  • Install up to (7) downspouts, (2) splash guards, (5) miters to match existing layout.

Roof Replacement For Home In Estero Florida

Our roofing division recently had the pleasure of serving a wonderful customer in the Cascades community located in Estero Florida. Following a roof inspection, we found the roof to be damaged as a result of Hurricane Irma. Our office assisted the homeowner by performing a complete roof replacement and gutter installation. After we removed the existing roof, our team installed new Barcelona 900 Boral tile on this gorgeous home. We would like to thank our customer for entrusting our roofing division to perform their roof repairs, and welcome the opportunity to serve their roofing needs in the future.

Special Materials:

  • Tile Manufacturer: Boral
  • Style (Profile): Barcelona 900
  • Color: Irving Blend
  • Drip Edge Color: White

Scope Of Work:

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 180LF of new white 6″ aluminum seamless gutters.
  • Install up to (6) downspouts, (2) splash guards, (2) miters to match existing layout.

Roof Replacement For Fort Myers Beach Vacation Villas

Our roofing division recently had the privilege of working with Polynesian Village Vacation Villas on Fort Myers beach. Following roof damage from Hurricane Irma, it was determined that roof replacements were needed for several structures on the property. Our team completed shingle roof replacements and gutter installations for these one and two story buildings. In addition, we also completed a re-roof for a flat roofing structure. These roofs came out great, and will serve our customer for years to come!

Special Materials

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work

Provide permit, labor, and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis. See disclaimer.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install (1) layer of peel and stick on low slope area and (1) layer of cap sheet on low slope area.
  7. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys.
  8. Install 26 GA galvalume kitchen and dryer vents.
  9. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish.
  10. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  11. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking.
  12. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  13. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  14. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  15. First Service will provide 2-yr workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.
Provide permit, labor and materials to complete the following:
  • Remove roof covering and underlayment.
  • Re-nail decking to local hurricane mitigation code.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter. The flat roof will be replaced using Polyglass peel and stick base sheet and topped with Polyglass torch down cap sheet.
Provide labor and material to complete gutter installation for these one- and two-story buildings:
  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 130LF of new white 6″ aluminum seamless gutters on the first story. (office building)
  • Install up to 285LF of new white 6″ aluminum seamless gutters on the second story. (2 story building)
  • Install up to (14) downspouts and (6) miters to match existing layout.

Cape Coral Asphalt Shingle Roof Replacement

Our roofing division was contacted to inspect a shingle roof in Cape Coral Florida for damage. The roof had experienced damage from Hurricane Irma and it was determined that a roof replacement was required. We sprung into action and were able to remove the existing roofing structure, and replace with GAF 130mph rated Timberline HDZ shingles. In addition to the new roof, this beautiful home also received a new seamless gutter system to complete the project.

Special Materials

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish. Standard color to be selected by Building Representative.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking. Color to be selected by Building Representative.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations. Color to match field shingle color.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2yr workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Provide labor and material to complete the gutter system:

  1. Install up to 45LF of new white 6″ aluminum seamless gutters on front of house.
  2. Install up to (2) downspouts, (1) miters to match existing layout.

Shingle Roof Replacement For A Cape Coral Home

Our office was contacted to inspect a home’s 23 year old roofing structure. Upon inspection, it was determined that the existing roof had a number of leaks and required a complete shingle roof replacement. As our roofing division completed the home’s re-roof, we also reinstalled fascia and soffit around the front doorway and left side of the home. Loose fascia was secured around the entire home, and the drip edge and fascia that tied into the walls was resealed. We also reinstalled the gutter on the left corner of the home and sealed all cuts in the drip edge in the customer’s gutter ends. Our customer can rest easy knowing that their home is protected by GAF’s 130 MPH rated Timberline HDZ shingles!

Special Materials

  • GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment
  • Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment
  • 26 GA – 16″ – Mill (50′) galvalume valley metal
  • 26 GA galvalume kitchen and dryer vents
  • GAF Pro-Start starter shingle
  • 130 mph GAF Timberline HDZ shingles
  • GAF Seal A Ridge Hip & Ridge Cap Shingles
  • GAF Cobra Rigid Vent3 Exhaust Vent system

Scope Of Work

Provide permit, labor and materials to complete the following:

  1. Remove existing layers of shingles, underlayment, fasteners and dispose of in First Service dumpsters.
  2. Inspect the condition of existing decking, flashing, and fascia board for their suitability of re-use. Any damaged or deteriorated materials will be replaced on a unit price or time and material basis.
  3. Re-nail existing plywood roof deck to meet current Florida Building Code.
  4. Furnish and install (1) layer of GAF Weather Watch Mineral-Surfaced Leak Barrier Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck in all valley and penetration locations.
  5. Furnish and install (1) layer of Leak Barrier MS300 Ice and Water Armor Self-Bond Peel & Stick, self-adhered shingle underlayment, applied direct to plywood roof deck.
  6. Furnish and install new 26 GA – 16″ – Mill (50′) galvalume valley metal in all valleys.
  7. Install 26 GA galvalume kitchen and dryer vents.
  8. Furnish and install drip edge fabricated from 26-gauge steel with a baked enamel finish.
  9. Furnish and install GAF Pro-Start starter shingle at all eave/rake locations.
  10. Furnish and install 130 mph GAF Timberline HDZ shingles, nailed with (6) nails per shingle, to plywood decking.
  11. Furnish and install GAF Seal A Ridge Hip & Ridge Cap Shingles at all hip and ridge locations.
  12. Furnish and install a GAF Cobra Rigid Vent3 Exhaust Vent system at applicable ridge lines.
  13. Furnish and install new lead pipe boots where existing pipes penetrate the roof surface.
  14. First Service will provide 2yr workmanship warranty and a GAF SYSTEM PLUS 50 YEAR NON-PRORATED WARRANTY ON ANY GAF MATERIAL ON THE ROOF. Stain Guard algae protection and 10-year limited warranty against blue-green algae discoloration available only on shingles sold in packages bearing the StainGuard® logo.

Punta Gorda Tile Roof Replacement

Our roofing division was contacted by a Punta Gorda homeowner that had a tile roof that experienced roof damage as a result of Hurricane Irma. Upon inspection, it was determined that the customer’s home required a tile re-roof. Our team mobilized and removed the old roofing structure and installed the new roof in accordingly. In addition to replacing the roof on this home, our team also installed a complete gutter system for the home’s new roof.

Special Materials

Tile Manufacturer: Boral

  • Style (Profile): Villa 900
  • Color: Arbor Green
  • Drip Edge Color: White

Re-Roof Scope Of Work

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and/or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application along with manufacturers warranties.

Gutter Installation Scope Of Work

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 135LF of new white 6″ aluminum seamless gutters.
  • Install up to (5) downspouts, (2) splash guards, (3) miters to match existing layout.

 

Fort Myers Home Receives Tile Roof Replacement

Throughout Southwest Florida, we are still finding an abundance of roofing structures that experienced damage from Hurricane Irma. Most homeowners aren’t able to spot the signs of a damaged roof which can include uneven lines on the roof, lifted shingles or tile, leaks, cracks, or even granule loss. When you contact our roofing division, you will receive a complimentary roof inspection that will outline any issues with your home’s roof, while educating of your options for resolution moving forward.

This particular Fort Myers home’s roof was damaged as a result of Hurricane Irma. Our office was contacted, and we mobilized to diagnose and ultimately repair the issue for this great homeowner. Additionally, our team repaired both the gutters and soffit at the time the new roof was installed. We’re blessed for the opportunity to serve our great community and thankful for our great clients!

Special Materials

  • Tile Manufacturer: Boral
  • Style (Profile): Estate
  • Color: Gold Dust
  • Drip Edge Color: White

Scope Of Work

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application. Provide manufacturers warranties.

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 270LF of new white (match existing) 6″ aluminum seamless gutters.
  • Install up to (6) downspouts, (5) splash guards, (7) miters, (11) end caps to match existing layout.

Another Fort Myers Home Tile Roof Replacement Complete

Our roofing division is hard at work serving the roofing needs of residential roofing clients throughout Southwest Florida. This beautiful home in Fort Myers Florida, unfortunately sustained roof damage courtesy of Hurricane Irma. Upon inspecting the existing roofing structure, it was determined that a complete tile re-roof was needed in order to service the needs of our customers. Additionally, we also removed the existing gutters and installed a new gutter system at the time of the roof replacement.  Their new Terra Cotta roof provides a nice contrast of color to the home, while more importantly protecting those who live in it from our harsh Florida weather. We’re thankful for the opportunity to serve the roofing needs of our great customer, and look forward to serving any additional painting or restoration needs they may have in the future!

Special Materials

  • Tile Manufacturer: Boral
  • Style (Profile): Estate
  • Color: Terra Cotta
  • Drip Edge Color: Tan

Re-Roof Scope Of Work

Provide permit, labor and materials to complete the following:

  • Remove existing tile and underlayment and dispose of in accordance with local code.
  • Inspect existing decking. Damaged or deteriorated decking will be replaced on a unit price basis. See below.
  • Re-nail decking to meet hurricane mitigation code.
  • Install tile underlayment to entire roof surface.
  • Install new 26 GA pre-painted drip edge flashing to entire roof perimeter.
  • Install new 26 GA galvalume valley metal in all valleys.
  • Install 26 GA galvalume kitchen and dryer vents.
  • Install 26 GA eave closure metal.
  • Install new lead flashing around all plumbing stacks.
  • Install a new tile roof system with foam adhesion and or two screw fastener application system as per manufacturer specifications.
  • Provide five (5) year workmanship warranty on tile application along with manufacturers warranties.

Gutter Installation Scope Of Work

Provide labor and material to complete the following:

  • Remove and dispose of the existing gutters and downspouts.
  • Install up to 215LF of new tan 6″ aluminum seamless gutters.
  • Install up to (6) downspouts, (2) splash guards, (6) miters to match existing layout.

Fort Myers Apartment Community Roof Repair

Our company contracts with several property managers throughout the state of Florida to serve their maintenance needs. When we were recently contacted by Northland properties to complete regular repairs for this Fort Myers apartment community, we jumped at the opportunity to help! Our teams completed multiple projects ranging from tile roof repairs to soffit repairs, and gutter installation. Below, we will outline the scope of work for these recent repairs, and showcase the results.

Repair Scope Of Work

Provide labor and materials to complete the following tile roof repair:

  • Inspect the existing tile around one missing tile to ensure no additional damages.
  • Replace roof underlayment and/or flashing as needed.
  • Install new tile that match as close as possible in color and style.
  • Clean worksite of all work-related debris upon completion.

Scope of work for New 6″ white aluminum seamless gutters along one story front side of the club house building:

  • New gutters will be end capped on the left side of the front of the building and end capped on the right side of the front of the building.
  • Prep all drip edge and fascia to receive new gutters.
  • Stage our ladders and equipment along the landscape of the front side of the building.
  • New 6″ white aluminum seamless gutters will be installed on the one-story section of the front side of the club house.
  • Install 2 new downspouts.
  • Re-work and tie-in two existing downspouts.
  • Install 4 inside corners
  • Install 2 outside corners
  • Install 6 end caps