Category Archives: Remodeling

Master Bathroom Remodel And Paint Project In Cape Coral

With decades of paint and interior finishing experience, many Southwest Florida residents turn to First Service with their remodeling needs. Our office recently completed a master bathroom remodel for a wonderful client in Cape Coral Florida. We removed the existing bathtub, deck, and tile in the bathroom. Additionally, our team also removed tower on the shower walls and prepared the area for our customer’s requested modifications. The shower wall was enlarged and the drain and supply lines were adjusted as needed once the wall was framed. Our team then proceeded to install a new freestanding tub and fixture, completed tile work in the shower area and floor, drywalled the walls accordingly, and painted the bathroom based on our customers selections.

This remodeled bathroom turned out great and our customer couldn’t be happier with the finished product.

Scope Of Work:

Provide labor and materials, except noted, for the below mentioned project:

  • Prep area where work is to be performed, lay Ram Board as needed to protect floor.
  • Demo tub, tub deck, tile surround including walls at water closet, and knee wall.
  • Demo tile on shower walls and floor.
  • Demo fixed glass at shower wall, fill in with proper framing as needed.
  • Enlarge opening into shower, size to be determined in field.
  • Adjust drain and supply lines as needed to install customer supplied freestanding tub and fixture.
  • Build 4′ knee wall at water closet.
  • Install customer supplied freestanding tub and fixture.
  • Install customer supplied tub splash guard wall tile, 50 sq. ft.
  • Tile remaining floor with customer supplied tile to match existing. Customer has on site.
  • Install two new can lights into shower tying into existing switch.
  • Rework plumbing in shower as needed for two shower heads on opposite wall, valve to be in original location.
  • Trench shower drain to accept linear style drain in existing location.
  • Construct two niches in wall underneath new shower heads.
  • Install customer supplied shower fixtures / valve.
  • Install customer supplied tile foot shelf, shower floor and wall tile, 175 sq. ft. wall tile and 32 sq. ft. floor tile.
  • Frame in shelf above linen, match texture to existing as close as possible.
  • All new drywall not tiled, to match existing wall texture as best as possible.
  • Paint entire bathroom walls, color to be determined.
  • Install new baseboard where tile was removed, match to existing, First Service to supply.
  • Note: Trench shower drain to accept linear style drain at end of shower and re-slope for proper drainage

Kitchen Fire Restoration

A Fort Myers homeowner contacted our company to restore the interior of their condominium after experiencing damage from a kitchen fire. Our restoration team mobilized and provided the following services to the homeowner.

Scope of Work:

Kitchen

  • Replace countertops and cabinets
  • Install sink, sink faucet and garbage disposal
  • Replace fluorescent light fixture
  • Drywall repair and texture
  • Acoustic ceiling popcorn texture
  • Seal/prime and paint walls, ceiling, and baseboards

Interior repaint of dining room, living room, bedroom, and bathroom.

Cape Coral Condominium Remodel: Tarpon Point

Project Information:

This family hired First Service to do a complete demo and remodel of their beautiful condominium unit in Tarpon Point in Cape Coral. We had a blast working together with our client building out this amazing living space and hope you enjoy the transformation.

Special Materials:

Sherwin Williams Interior Duration, Sherwin Williams Pro Classic semi-gloss

Scope of Work:

  • Removed all flooring, casing and base throughout unit including porches, patios and elevator area.
  • Installed all new tile throughout. Installed all new pro-flex underlayment and tile.
  • Removed all arches throughout unit. This included drywall and framing, everything squared off.
  • Made new opening into kitchen from front hallway where existing pantry was and framed and drywalled. Two columns remained and wrapped in drywall.
  • Painted entire unit throughout.
  • Re-designed kitchen which included new pantry, re- located sink area, refaced all cabinets and replaced all doors.
  • Made existing TV niche larger to fit new TV.
  • Re-worked electric so there were two separated switches for the lights above sink and bar top.
  • Removed two soffit areas in the kitchen area and re-worked the main rectangle into an L- shape.
  • Framed in area for a wine cooler to sit next to bar area in living room.
  • Master closet wall separating his and hers was removed and doors blown out to hallway depth and new double doors installed.
  • Master Bathroom was completely demoed and shower moved. Two new vanities and 1 new linen closet built out. for shower door. Demo and frame new closet in guest bathroom $750.00 Where niche is to remain install two puck lights in hallway. Remove and replace all outlets and switches to match decor style smoke detectors and install new lights.
  • Installed new light in hall bathroom above sink.
  • Removed trim on front doors and applied new trim to match interior doors.
  • KITCHEN Fridge opening to be 39 by 74
  • LAMINATE EXISTING CABINETS MAKE NEW FLAT PANEL DOORS, ADD PANTRY AND ISLAND CABINETS TO MATCH WET BAR
  • REMOVE BASE CABINET ADD SPACE FOR WINE COOLER LAMINATE AND ADD FLAT PANEL DOORS
  • MASTER BATH: MAKE NEW VANITY CABINETS TO MATCH KITCHEN HALL BATH, ADD VANITY CABINET L/R, RAISE UPPERS LAMINATE, ADD NEW FLAT PANEL DOORS AND MAKE NEW SINK BASE CABINET
  • 2ND BATH: LAMINATE AND ADD NEW FLAT PANEL DOORS
  • 3RD BATH: LAMINATE AND ADD NEW FLAT PANEL DOORS
  • CLOSETS: NEW CLOSET CABINETS IN MASTER CLOSET WITH ISLAND
  • MURPHY BED: NEW MURPHY BED CABINET AND FRAME WITH SLAB DOORS
  • BUILD OUT TV CABINETS